• CIVIL EDGE
  • Posts
  • Balfour Beatty: From a £199m Loss to Today's Megaprojects

Balfour Beatty: From a £199m Loss to Today's Megaprojects

From its historic roots in 1909 to Leo Quinn’s game-changing leadership, Balfour Beatty is engineering the future of global infrastructure.

George Balfour (left), Andrew Beatty (right)

Balfour Beatty’s name is synonymous with global infrastructure. With over 100 years of experience, the company has not only shaped the skylines and landscapes of today but has also laid the foundations for the innovations of tomorrow. From the first tramway upgrade in 1909 to pioneering projects in nuclear energy and high-speed rail, Balfour Beatty has continually redefined what’s possible in civil engineering.

This deep dive explores the company's legacy, its key milestones, and how its unwavering commitment to innovation and sustainability continues to drive industry leadership. It’s a story of overcoming challenges, seizing opportunities, and pushing the boundaries of engineering excellence on a global scale.

1909: A Modest Start with Grand Ambitions

George Balfour, an engineer, and Andrew Beatty, an accountant, joined forces in 1909 to create Balfour Beatty. Their first project, a £5,000 tramway upgrade (£745,000 in 2024 prices), set the stage for a company that would soon become synonymous with groundbreaking infrastructure.

Their first contract, running tramlines in Luton and Dartford in 1909

Early Success: Breaking Ground in Civil Engineering

1917: The Kinlochleven aqueduct marked the company’s first significant civil engineering achievement.

Final pipe in the Kinlochleven hydro scheme is placed in position

World War I: Balfour Beatty demonstrated resilience with the Lochaber hydroelectric project, mobilising 3,000 workers and completing essential infrastructure under challenging conditions.

Post-War Growth and Global Expansion

1922: Power Securities Corporation launched, enabling hydroelectric developments like the Loch Treig to Loch Linnhe scheme.

1924: International expansion began with a hydroelectric project in India.

1930s: Projects in Malaya, India, Sudan, Bermuda and South Africa solidified Balfour Beatty’s global reputation.

1930s construction of early railways in Bermuda

Building Through Challenges

World War II: From the Churchill Barriers to the Mulberry harbors, the company’s contributions were critical to national defense.

1940s construction of Churchill Barriers

1950s: Balfour Beatty led post-war rebuilding with projects like the Sloy Dam, Blackwall Tunnel, and early UK nuclear infrastructure.

The Era of Mega Projects

1960s-70s Highlights:

  • Kainji Dam, Nigeria (1969): Providing power and irrigation solutions.

  • Second Blackwall Tunnel: Easing congestion in London.

  • 1969 Merger: Joining BICC expanded expertise in rail electrification and motorways.

  • Kielder Dam (1976): Europe’s largest man-made reservoir.

Completion of £5.3m second Blackwall Tunnel bore in 1967

1980s-90s: Redefining Possibilities

Key Projects:

  • Channel Tunnel (1986-94): A monumental feat of engineering.

1987 - Balfour Beatty plc deep underground, hard at work on the Channel Tunnel!

  • Cardiff Bay Barrage and Hong Kong Airport Terminal (1990s): Pushing engineering boundaries.
    1995: Entered the PPP market, modernising the West Coast Main Line and advancing renewable energy projects.

Balfour Beatty built the £830m terminal at Chek Lap Kok airport in Hong Kong (1998)

21st Century: Leading the Charge

2001: Strategic acquisitions, including Mansell in 2003, enhancing refurbishment capabilities.

2014: A Pivotal Turnaround: Leo Quinn and the ‘Build to Last’ Strategy

Leo Quinn, CEO of Balfour Beatty

Balfour Beatty hit a major setback in 2015, suffering a £199 million (£275 million in 2024 prices) pre-tax loss due to cost overruns and project delays. The company needed urgent restructuring, and Leo Quinn, appointed CEO that year, was tasked with leading the recovery.

Quinn introduced the Build to Last programme, a comprehensive strategy focused on cutting costs, improving risk management, and increasing transparency. The results were evident by 2016, when Balfour Beatty posted a modest profit of £8 million, signaling the start of a positive shift. By 2017, the company was on track to achieve industry-standard margins, marking a successful transition into the second phase of Quinn’s plan.

Under Quinn’s leadership, Balfour Beatty not only recovered but began positioning itself for sustainable growth, laying a solid foundation for future success.

Recent Milestones

2010s:

  • Hinkley Point C: Aiding the UK’s nuclear ambitions.

  • HS2: Revolutionising high-speed rail.

  • Thames Tideway Tunnel: Tackling London’s sewage challenges.

Hinkley Point C - Tunneling

2020s: Despite the challenges of the COVID-19 pandemic, Balfour Beatty maintained a robust £16.4 billion order book and continued delivering on flagship projects like HS2, Hinkley Point C and LAX Airport (Los Angeles). Notable achievements include the construction of smart motorways and contributions to offshore wind energy projects.

Driving Sustainability and Innovation

Talent and Leadership

Financial Resilience

2023 Performance:

  • Revenue rose 7% to £9.6 billion.

  • Order book reached £16.5 billion.

  • Profit stood at £236 million, driven by efficient project execution.
    Focus Areas: Energy, transport, defense, renewables, and digital infrastructure.

A Legacy Built to Last

From its modest beginnings to its role in delivering global megaprojects, Balfour Beatty’s journey exemplifies over a century of engineering excellence. Today, under the leadership of Leo Quinn and his team, the company is not only building on that rich legacy but also charting a path toward the future. The Build to Last strategy has laid a strong foundation, positioning Balfour Beatty to tackle tomorrow’s challenges with innovation, sustainability, and a commitment to excellence.

As the company continues to push boundaries in infrastructure and digital solutions, its leadership is ensuring that the next generation of engineers and visionaries will have the tools and inspiration to build a better world - just as Balfour Beatty has done for over a century.

A note from Civil Edge: Once a week, we deliver a quick, easy-to-read roundup of the top civil engineering news, crafted for busy leaders like you. Think of it as having a colleague who sifts through the noise and shares the key insights that keep you ahead. Subscribe now and level up your expertise.

Reply

or to participate.